Industrial Cupboard and How Does it Actually Work?
July 26th, 2022
An industrial cupboard is a storage cabinet with a flat top surface, typically made of metal or plastic, that can be used to store materials in an industrial setting.
An industrial cupboard is usual
The Significance of Secure Material and Equipment Storage
April 25th, 2022
Whether you own a warehouse, office, or other commercial space, the materials and equipment must be stored and organised safely. This is done to reduce the likelihood of potentially life-threatening
Safes For Valuables
February 11th, 2022
Buying any product can be daunting, but when selecting a safe there is the added pressure that the incorrect choice could result in the loss of cash or valuable items – some of which could be ir
Ways To Prevent Tool Theft From Vans | Tool Storage Solutions For Vans
February 3rd, 2022
It is estimated that in the United Kingdom a van is broken into every 23 minutes.
Individuals and businesses are losing vast amounts of money as thieves target vans for the tools located inside.
The
Part 4: 5S Standardise – Maintain The System
January 21st, 2022
The fourth step in the 5S methodology is Standardise, or ‘Seiketsu’. This ties in to the standardisation of the first three methodologies in the 5S system that we have already covered R
Part 3: 5S Shine – Keeping It Clean
January 13th, 2022
Now that all of the clutter is gone (using methods from Part 2) and your workspace organised, it is time to get cleaning. This is the shine stage of the methodology or the ‘Seiso’ stage
Part 1: 5S Sort – Start With Sorting
January 10th, 2022
The new year is a perfect time to have a good sort out, most of us do it without even realising it is the first steps of a 5S methodology aimed at organising your workplace and making you more efficie
Part 2: 5S Set In Order – Organise Your Bits
January 10th, 2022
Once you have sorted through everything, the next step is to Set in Order (Seiton). All the items that you deemed necessary in Part 1 can now be placed back in your workstation in a more organised m
Christmas Closure 24/12/21 – 04/01/22 ?
December 19th, 2021
It’s that time of year again!
Storage Industrial will be closed between the following dates:
Friday 24th December 2021 to Tuesday 4th January 2022
Wishing you a Merry Christmas and